Nelligan

Metanor holds an option enabling it to acquire an interest of 70% in this property, which includes 58 claims, covering an approximate surface of 2,881 hectares, located immediately west of the Bachelor property. During an exploration campaign completed by Murgor Resources in 2006, intersections of 582 g/t Au over 0.53 m and 3.15 g/t Au… Read more »

Moroy

The Moroy Project consists of a group of 12 designated cells totaling an area of about 578 Ha.  The project overlain a mafic to felsic volcano-sedimentary sequence crosscut by the O’Brien Pluton (syenite). Structural controls for mineralized fluids in the area are the Lamarck syn-volcanic fault (NE-SW) further west, some shears and deformation corridors, and… Read more »