METANOR INTERSECTS 12 g/t OVER 3.25 METERS AT BACHELOR MINE

July 30, 2015 – Val-d’Or, Quebec, Canada: Metanor Resources Inc. (“Metanor”) (TSXV: MTO) is pleased to present an update of the exploration activity at Bachelor Mine.  The second drill located on level 6 has intersected 12 g/t over 3.25 meters.  The drill holes intersected the vein above levels 6.

The results are in the table below:

Hole N°

From (m)

To (m)

length (m)*

Au grade capped (g/t)

Zone

6-165

66.4

67.3

0.9

4.77

6-H-10

6-166

78.1

79.85

1.75

8.92

6-H-10

6-169

85.65

89.2

3.55

6.24

6-H-10

6-172

89.8

61.3

1.5

22.27

6-H-10

6-173

59.45

62.7

3.25

2.65

6-H-10

6-174

58.98

62.23

3.25

11.96

6-H-10

6-175

58

59.75

1.75

1.24

6-H-10

6-176

58.85

62

3.15

9.36

6-H-10

6-177

63.09

63.49

0.4

6.35

6-H-10

*Core length

These new results demonstrate the extension of the vein in Hewfran above level 6 (See the longitudinal section for the holes location).

PR_2015-07-30_v0_drill_re...
Size: 105.96 KB Format: PDF