METANOR INTERSECTS 7.2 g/t OVER 8.1 METERS AT BACHELOR MINE

September 15, 2015 – Val-d’Or, Quebec, Canada: Metanor Resources Inc. (“Metanor”) (TSXV: MTO) is pleased to present an update on the underground exploration activity at Bachelor Mine.  A drill located on level 6 has intersected 7.2 g/t over 8.1 meters.  The drill hole intersected the vein 8-H-14 between level 6 and level 8.  The results are in the table below:

Hole N°

From (m)

To (m)

length (m)*

Au grade capped (g/t)

Zone

6-153

109.7

110.6

0.9

2.3

8-H-14

6-154

112.0

119.7

7.8

1.4

8-H-14

6-155

103.7

105.5

1.8

4.8

8-H-14

6-157

91.0

91.4

0.4

12.9

8-H-14

109.5

113.0

3.4

2.6

8-H-14

6-158

112.2

114.1

2.0

1.5

8-H-14

6-171

69.7

74.2

4.5

1.3

6-H-12

6-178

18.93

21.10

2.16

20.0

6-H-4

6-179

27.56

31.86

4.30

8.8

6-H-4

6-180

14.39

15.73

1.34

2.6

6-H-4

6-181

39.54

41.49

1.95

16.9

6-H-12

6-184

72.1

74.0

1.9

8.2

6-H-12

78.3

79.1

0.8

6.1

6-H-12

6-185

96.2

99.0

2.8

5.1

8-H-14

6-187

117.6

118.2

0.6

11.6

8-H-14

121.0

126.5

5.5

8.6

8-H-14

6-188

111.1

119.2

8.1

7.2

8-H-14

including

111.1

114.2

3.0

13.4

8-H-14

including

116.2

119.2

3.0

5.2

8-H-14

6-189

117.1

119.8

2.7

2.6

8-H-14

6-190

114.6

122.0

7.3

3.0

8-H-14

including

114.6

117.1

2.4

5.4

8-H-14

including

120.7

122.0

1.2

6.2

8-H-14

133.9

140.5

6.6

2.1

8-H-14

6-191

114.6

122.0

7.3

3.0

6-H-12

6-192

74.4

77.3

2.9

10.8

6-H-12

6-193

74.6

77.2

2.5

8.9

6-H-12

6-194

73.0

75.0

2.0

7.4

6-H-12

6-195

84.6

85.7

1.1

13.4

6-H-12

6-196

74.6

75.6

1.0

2.0

6-H-14

6-197

89.1

92.1

3.0

8.0

6-H-14

6-198

79.9

81.6

1.8

6.4

6-H-14

*Core length

These holes demonstrate the concentration of gold mineralization between level 4 and level 8 in the Hewfran sector (See the longitudinal section for the holes location).  The development activities are presently within 50 meters from the 8-H-14 sector.  The construction of a diamond drill bay on level 8 is planned in October to drill below toward level 10 and 12.

The development activities reached the mineralized zone in the 6-H-10 last week.  The average width of the ore is 4.0 meters over the first 11 m of sill excavated.  The grade to date is 11.4 g/t over the excavated length.  The vein remains open to the east and west.

PR_2015-09-15_v0_drill_re...
Size: 123.48 KB Format: PDF