METANOR INTERSECTS 10.2 g/t OVER 13.1 METERS AT BACHELOR MINE

August 6, 2015 – Val-d’Or, Quebec, Canada: Metanor Resources Inc. (“Metanor”) (TSXV: MTO) is pleased to present an update on the underground exploration activities at the Bachelor Mine.  A drill located on level 6 has intersected 10.2 g/t over 13.1 meters.  The drill hole intersected the vein between level 6 and level 8.  The results are in the table below:

Hole N°

From (m)

To (m)

length (m)*

Au grade capped (g/t)

Zone

6-139

114.3

121.5

7.2

10.4

8-H-14

6-142

95.0

96.9

1.9

5.2

8-H-14

6-143

84.8

86.0

1.2

7.5

8-H-14

6-144

113.2

126.3

13.1

10.2

8-H-14

6-182

65.8

67.7

1.9

8.6

6-H-10

6-183

61.0

63.6

2.6

2.80

6-H-10

*Core length

These new results demonstrate the extension of the vein in Hewfran above level 6, and below to level 8. (See the longitudinal section for the holes location).  The development activities are approaching the targeted sector on level 8.  Once reached, a new diamond drilling station will be established to drill deeper below level 8 down to level 10 and 12.

PR_2015-08-06_v0_drill_re...
Size: 113.69 KB Format: PDF