Press Releases

Yearly Archives: 2015

METANOR INTERSECTS 5.4 g/t Au OVER 10.0 METERS ON THE MOROY PROPERTY

December 17, 2015 – Val-d’Or, Quebec, Canada: Metanor Resources Inc. (“Metanor”) (TSXV: MTO) is pleased to provide this update on its exploration drilling program conducted from the surface, on the Moroy property located south of the Bachelor mine.  A hole has intersected 5.4 g/t over 10.0 meters (MO-15-104).  This hole intersects the structure along the section A-A’ and… Read more »

PR_2015-12-08_v0_surface_...
Size: 880.81 KB Format: PDF
METANOR INTERSECTS 15.3 g/t Au OVER 6.6 METERS

December 8, 2015 – Val-d’Or, Quebec, Canada: Metanor Resources Inc. (“Metanor”) (TSXV: MTO) is pleased to provide this update on its exploration drilling program, from the surface, on the Moroy property located south of Bachelor mine (the South Zone).  A hole intersected 15.3 g/t over 6.6 meters (MO-15-68). Two drills are presently drilling on this property.  Many holes… Read more »

PR_2015-12-03_v0_Hewfran_...
Size: 524.67 KB Format: PDF
METANOR INTERSECTS 6.3 g/t Au OVER 4.2 METERS AT BACHELOR MINE; CONFIRMS TREND BELOW LEVEL 8

December 3, 2015 – Val-d’Or, Quebec, Canada: Metanor Resources Inc. (“Metanor”) (TSXV: MTO) is pleased to provide this update on its underground exploration drilling program at Bachelor Mine.  A drill located on level 8 in the Hewfran sector of Bachelor Mine intersected 6.3 g/t over 4.2 meters (hole 8-109).  These holes listed below intersected the H-10 vein below… Read more »

PR_2015-12-03_v0_Hewfran_...
Size: 524.67 KB Format: PDF
METANOR REPORTS ITS FINANCIAL AND OPERATIONAL RESULTS FOR THE QUARTER ENDED SEPTEMBER 30TH 2015

November 27, 2015 – Val-d’Or, Quebec, Canada: Metanor Resources Inc. (“Metanor”) (TSX – V: MTO) reports its financial results for the quarter ended September 30th 2015 (Q1 2016).  This press release should be read in conjunction with Metanor’s financial statement for the year ended September 30th 2015 and related Management’s Discussion and Analysis (MD&A), which… Read more »

PR_2015-11-27_v1_Q1_finan...
Size: 101.39 KB Format: PDF
CLOSING OF SECOND TRANCHE; $ 842,327 IN PRIVATE PLACEMENT

November 19, 2015 – Val-d’Or, Quebec, Canada: Metanor Resources Inc. (“Metanor“) (TSX – V: MTO) announces that it has completed a second tranche of $842,327 in the brokered private placement undertaken by Secutor Capital Management Corporation, for total gross proceeds raised of $3,507,127, and has issued in connection with this tranche: i) 5,000,000 units priced… Read more »

PR_2015-11-19_private_pla...
Size: 90.97 KB Format: PDF
METANOR CONFIRMS THE DISCOVERY OF A NEW AURIFEROUS CORRIDOR NEAR SURFACE

October 27, 2015 – Val-d’Or, Quebec, Canada: Metanor Resources Inc. (“Metanor”) (TSXV: MTO) is pleased to provide this update on its exploration drilling program, from the surface, in the area surrounding the Bachelor Mine.  The analysis and assaying of hole MO-15-14 (published on September 22nd ) continued and more auriferous zones were identified below the original discovery. The… Read more »

PR_2015-10-27_v0_surface_...
Size: 93.92 KB Format: PDF